There shall be light

The IOCards are fully funtioning and controlling the lamps on the frontpanel! Sadly the pictures don't look as good as in reality The left panel shows important information (HSI and RWR) with FalconGauges: To finish the frontpanel, DED and the right MFD-monitor have to be installed.

Continue ReadingThere shall be light

Inputs at last

Now, since the "hardware"-part of panelmaking is done, I could start with connecting the panels to the GammaRay-Inputcard. Both MFDs, the ICP and the MISC panel are working, and move the corresponding switches/buttons in Falcon:AF. Until the end of August, I plan to have all panels connected an working.

Continue ReadingInputs at last

End of content

No more pages to load